
Call 01766 513162 to discuss your project
INTEGRATED LVIA FOR WALES
06.
NEL NICHOLSON
ENERGY INFRASTRUCTURE/ CUMULATIVE ASSESSMENT

NEL NICHOLSON
Green Battery Development within Rural Settled Clay Farmlands & Local Wildlife Site Setting
SUMMARY
180MW (2hr) Green battery development between Barnby Dun and Arksey districts within low-lying flood plain landscape. Site presented cumulative energy infrastructure concerns with three concurrent projects (Almholme Energy Hub, two Thorpe Marsh schemes), Local Wildlife Site adjacency (Bentley Tilts and Course of Old Ea Beck), flood defence embankment constraints, Thorpe Marsh Nature Reserve proximity 600m northwest, and Grade II listed residential receptor along Common Lane requiring heritage setting assessment.
KEY OUTCOMES
-
Consent granted with LVIA demonstrating landscape effects Moderate/Minor Adverse reducing to Minor Adverse at Year 15; visual effects Minor Adverse to Minor/Negligible reducing to Negligible/None through comprehensive screen planting establishment.
-
Cumulative assessment across four concurrent energy infrastructure projects confirmed principal scheme contributed minor significance to combined effects; separate landscape character containment of Thorpe Marsh schemes through PFA bunding and woodland buffer limited cumulative landscape contribution.
-
BNG Strategy delivered 50% site allocation to green infrastructure creating ecological corridor between Thorpe Marsh Nature Reserve and Rivers Don/Dun, complementing Green Infrastructure corridor strategy through structural native planting and mixed scrub habitat.
-
Cumulative visual effects predominantly sequential with moderate adverse reducing to minor adverse at Year 15; diminutive builtform heights within low-lying flood plain enabled successful screening within structural planting envelope.
-
Grade II listed Low Farmhouse demonstrated Minor Adverse effects reducing to Negligible/None through western perimeter screen planting; Transpennine Trail and wider PRoW network confirmed no inter-visibility through mature field boundary layering.
-
Landscape integration strategy addressed Tollbar Settled Clay Farmlands character through 20m buffer to adjacent Local Wildlife Site and 9m buffer to Hurst Pit Drain, with effects localized to immediate peripheries along Fordstead Lane and mid-range filtered views from Almholme hamlet.
✓ BNG Integrated
LOCATION
Fordstead Lane, Doncaster
YEAR
2023
CLIENT
Newton Energi Ltd
